Free calculator · Workshops & manufacturing
How many hours do you really have this week?
Hours on paper are not the hours you have. Take off efficiency and stoppages, set them against the work to do and see whether the week holds.
Available hours per week
122 h
out of 160 h in theory
- Theoretical hoursmachines × hours × shifts × days
- 160 h
- Lost to efficiency and stoppages24% of the theoretical hours
- 38 h
- Utilisation120 h of work over 122 h available
- 98%
- Slackin the week
- +2 h
- Available hours per monthon average: 52 weeks divided by 12
- 529 h
The example is already filled in: change the figures and the result updates. The sum runs in your browser: nothing is sent or saved.
How it is worked out
Three steps, with the example’s figures.
Theoretical hours
Machines × hours per shift × shifts × days. In the example: 4 × 8 × 1 × 5 = 160 hours.
Available hours
Theoretical hours times real efficiency, minus planned stoppages: 160 × 80% − 6 = 122 hours. These are the hours you can promise against.
Utilisation
Work to do divided by available hours: 120 ÷ 122 = 98%. Above 85% one surprise is enough for something to slip; above 100% the hours are not enough.
With Taktra
In Taktra this sum redoes itself, every day.
Scheduling shows the load machine by machine and utilisation for the next two weeks, with the people present, public holidays, stoppages and maintenance. When something changes, dates are recalculated.
- Load and utilisation per machine, day by day
- An open stoppage zeroes capacity until the restart
- Expected date of every job from real capacity
Questions
Before you trust a number.
What is the difference between theoretical and available capacity?
Theoretical capacity counts every hour the machines could work. Available capacity takes off what really happens: set-ups, waiting, breaks, stoppages and maintenance. Promise dates to customers on the available figure.
How do I estimate real efficiency if I do not measure it?
Take a typical week: hours produced (pieces × standard time) divided by the hours staffed on the machines. Without data, 75–85% is a prudent starting point; below 70% a lot usually goes on set-ups and waiting.
What is a sensible utilisation?
Between 70% and 85% the floor runs full but can absorb a rush job or a stoppage. Above 85% every surprise moves a delivery; above 100% you need overtime or different dates.
Other free calculators
Realistic delivery date
The day the work is ready, with Saturdays, public holidays and closures.
OpenOEE of a shift
Availability, performance and quality: where machine time goes.
OpenFood cost of a dish
Cost per portion, food cost before VAT and the lowest price for your target.
OpenShift cost
Staff cost per week, per month and per opening hour.
OpenGive your work
its shape.
Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.
No card needed to start: 30 days free, then you decide whether to subscribe.